STL Permits

← Back

2630 ST VINCENT AV

Alteration Structure type 34 $8,000
Application dateJul 20, 2026
Issue dateJul 24, 2026
Days to issue4
Estimated cost$8,000
Project typeAlteration
Structure type34
First seen2026-07-25 14:22:35

Description

Remove existing jetted tub, tub valve, and tile surround. Electrician will reroute or remove the existing outlet in the wet area for the jetted tub unit. Install new smaller 60"x32" low barrier shower pan in place of the jetted tub. Build a new interior full height wall tied into the existing framing to enclose shower pan and install new shower valve. Install durarock backer board, acrylic surround, and a shower curtain rod.

Look up this address on stlouis-mo.gov →